SCB Cutoff Wall Installed at Edenville Dam

As part of the Edenville Dam restoration, the DeWind OPT team was selected by Four Lakes Task Force to install a Soil-Cement-Bentonite (SCB) cutoff wall through the center of the existing earthen embankment. Using specialized trenching equipment, we blended onsite soils with cement and bentonite to create a low-permeability barrier designed to reduce seepage once […]

SCB Cutoff Wall Installed at Edenville Dam Read More ยป